I hope it doesnt get built with imported steel from Poland that wouldnt go down too well ?
Bit like the new Bio mass plant Ensus at Wilton , built with Ukraine steel... shaped and fabricated in France and shipped to Uk
Sadly most steel was of bad quality, and was mishapen and had to be cut out and renewed which made the job longer
Loads of new Academy type buildings getting built... at the end of the day its the teachers whom job it is to learn students
and it needs dedicated students to learn to make it a success
Our goverment have an idea... good or bad , and think that throwing more money at it will solve the problem
It dont
